Notes for using materials platforms

2018-06-15 16:13:36

The materials platform is a variety of temporary operating platforms and operating racks that are often erected on the construction site. They are mainly used to transport materials, so the safety of the materials platform is particularly important.

[Summary description] 


1. The materials platform is a variety of temporary operating platforms and operating racks that are often erected on the construction site. They are mainly used to transport materials, so the safety of the materials platform is particularly important. A sign should be listed on one side of the platform, indicating the load-bearing capacity of the platform. If it is indicated that the maximum load of the material table is 800Kg, do not overload. Click here to download construction technical information for free. 2. When the materials platform is lifted to the last lifting point, it should be checked whether the connection point between the platform and the main body meets the design requirements, such as the structural requirements of each node. 3. Every time the materials platform is moved, it should be checked whether there is excessive deformation of the platform and whether there are small cracks in the welding seam. 4. The railing of the materials platform is

 

 

1. The materials platform is a variety of temporary operating platforms and operating frames that are often erected on the construction site. They are mainly used to transport materials, so the safety of the materials platform is particularly important. A sign should be listed on one side of the platform, indicating the load-bearing capacity of the platform. If it is indicated that the maximum load of the material table is 800Kg, do not overload. Click here to download construction technical information for free.

2. When the materials platform is lifted to the last lifting point, it should be checked whether the connection point between the platform and the main body meets the design requirements, such as the structural requirements of each node.

3. Every time the materials platform is moved, it should be checked whether there is excessive deformation of the platform and whether there are small cracks in the welding seam.

4. Whether the railings of the materials platform are reliable and whether they are damaged during hoisting.

5. Whether the tension of the two steel wire ropes on each side of the materials platform is close, and whether one is tight and the other is loose, otherwise, the reverse zipper should be used for adjustment.

6. The materials platform cannot be connected with the external scaffolding, because the materials platform has dynamic load, which will adversely affect the external scaffolding.

7. The lifting ring of the materials platform should be made of Q235 steel, the wire rope and the lifting ring should be connected with a snap ring, and the hook should not be directly hooked to the lifting ring. When the steel wire passing through the lifting ring is connected and fixed with a clip, the clips shall not be less than 3. Click here to download construction technical information for free.

8. The materials platform cannot be hung on the balcony and other parts, because the structural safety of the balcony and other parts is relatively small, and it should be hung on the theme structure beam and other parts.

9. The materials platform should be staggered in the vertical direction of the building, that is, the upper and lower positions, so as not to hinder the tower crane from lifting heavy objects.

10. The materials platform is moved to a new location. Before unloading the tower crane hook, check all parts, whether the platform is stable and reliable on the main beam, and whether the wire rope is stuck. After all inspections are feasible, the tower crane hook can be loosened.

11. The outer edge of the materials platform should be slightly higher than the inner edge, and should not be inclined outward.

12. Fence railings should be set on the three sides of the outer side of the materials platform. When the lifting component is too long, the end protective grille door should be opened when the length of the platform exceeds the length of the platform. After the component is transported into the building, it should be closed immediately. Before the official use of the materials platform, the operator should make a safety technical disclosure.

13. Explain the matters needing attention when using the materials platform and how to keep in touch with the operator on the platform and the tower crane driver to prevent accidents.